Gold Member Since 2009
Audited Supplier
Focusun Technology (Shanghai) Corporation

Cube Ice Maker, Ice Machine, Ice Maker manufacturer / supplier in China, offering Focusun Food Grade 500kg/24hours Cube Ice Making Machine, Focusun Cheap Cost Commercial Block Ice Making Machine, Focusun New Advanced Technology Ice Tube Plant and so on.

(/ )

Supplier Homepage Product Cube ice machine Focusun Food Grade 500kg/24hours Cube Ice Making Machine

Focusun Food Grade 500kg/24hours Cube Ice Making Machine

FOB Price: US $1-10,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1-10,000/ Piece
Get Latest Price
Production Capacity: 800units/Year
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: FIC
  • Cooling Way: Water-cooled
  • Unit Structure: Integral
  • Ice Temperature: -5℃~-10℃
  • Application Fields: Food Processing
  • Condition: New
  • Condenser: Air Cooled/Water Cooled
  • Quality: High Quality Ice Maker
  • Origin: Jiangsu, China
  • Ice Making: Spraying
  • Automation: Automation
  • Machine Size: Small
  • Ice Shape: Square Cube
  • Certification: CE
  • Gas: R440A
  • Ice Size: 23*23*23 L*W*H Mm
  • Trademark: Focusun
  • HS Code: 8418699020
Product Description

Hard clear ice cube, produced with a vertical evaporator for maximum efficiency. Max. cooling with 100% ice to water ratio. Perfect ice for max. cooling, slow melt, quick production. Ice production from 65G (30kg) to 3900G (1755kg) per day.
Ice weight: 10g;
Water content: 2%;
Ice dimension: 23*23*23mm L*W*H
 
We also provide you one package service of ice making, ice storing and ice packing. Standard ice production is 30kg/day~1755kg/day, but can be customized according to your real demand; Storage room and packing machine designed accordingly!

FAQ:

Q1: How many steps can I get the machine from your factory to my hand?
a. send us enquiry, tell us your demand as specific as you can;
b. phone/online communication → the most suitable models suggested → design drawings → comments & modification → quote;
c. visit factory if required, 
d. down payment → production → balance payment → delivery;
e. local preparation ready → engineers fly to installation if needed → after sales;
Q2: Production time?
It usually takes 38~45 working days to produce since the day when we confirm your down payment, for series equipments may need more days, will inform you before order.
Q3: Payment method?
100% TT is preferred, 50% TT before production, the balance 50% before delivery.

You're invited to visit our official website www.focusun.com, if any other questions, please don't hesitate to contact us, we're glad to help with your business project! 
Send your message to this supplier
Avatar
Miss Chris Ding
*From:
To: Miss Chris Ding
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now